A product submittal and a field acoustic test report are complementary documents. An assembly’s published Sound Transmission Class (STC) rating is not a guarantee of the performance of a completed building. Procurement teams should establish what each form of evidence is intended to demonstrate before construction begins.
What a laboratory rating establishes
A laboratory report describes the tested specimen under the referenced method. Review whether the submitted assembly corresponds to the construction being proposed and whether the specification calls for that type of evidence. See ASTM E90 for laboratory airborne sound transmission loss testing.
What field verification establishes
Field measurements concern the installed condition and the measurement scope defined by the project. Different field descriptors describe different aspects of sound isolation. Consult NIC versus STC and ASTM E336 for the distinction between laboratory and field evidence.
STC 45 and STC 50 in project specifications
STC 45 and STC 50 are construction-rating terms that may appear in secure-facility specifications. The applicable technical specification and project direction determine their use. Do not assume that the same numerical value applies to a field descriptor. Our Sound Group 3 and Sound Group 4 reference discusses the governing terminology.
Why a laboratory-rated door can disappoint in the field
A laboratory STC rating applies to the tested assembly, not every installation of a door bearing the same product name. Installed performance also reflects the surrounding construction and interfaces. Require the submitted test evidence to match the proposed assembly, and distinguish the specified construction rating from the required field metric. A high laboratory rating is not a substitute for installed-door verification.
A review checklist for project teams
Identify the intended evidence at submittal, the installed-performance measurement requirements, the criteria applicable to each, the responsible reviewer and the documentation required for closeout. Resolve inconsistencies through the authorized project representatives before commissioning the test.
Independent measurement services
OSAT offers independent acoustic field testing and installed-door acoustic assessment where specified. See the ICD 705 acoustic requirements overview for the relationship between technical requirements and project acceptance.